Flagship island market

Bermuda circular tire infrastructure.

A focused pathway to reduce tire-disposal pressure, establish documented collection and processing, recover useful materials and evaluate practical road and infrastructure end uses.

Island scaleFocused deploymentCompact logistics and concentrated feedstock
Public worksCore stakeholderRoad, waste and infrastructure coordination
Local reusePriority outcomeReduce dependence on export-only disposal
MRVEvidence firstDocument every ton from source to end use
Bermuda pathway

Build the project around measurable local conditions.

01

Collection

Map dealers, garages, fleets, public facilities and haul routes to establish dependable feedstock evidence.

02

Processing

Right-size shredding, separation and granulation equipment to the island's verified throughput needs.

03

Public works

Coordinate road specifications, waste policy, site requirements, permits and a technically controlled pilot.

04

End use

Develop local or export buyers for rubber and steel while documenting disposition and environmental value.

Road-material opportunity

A practical demonstration can make the circular model visible.

A small, properly engineered test section can evaluate whether recovered tire rubber has a useful role in Bermuda road materials. Specifications, mix design, contractor input and performance monitoring must drive the pilot.

  • Identify candidate public or private test section
  • Confirm approved technical specification and material size
  • Coordinate asphalt producer and paving contractor
  • Track construction, performance and maintenance
  • Document material volumes and project outcomes
Government-ready evidence

What Harborview organizes

Authority contacts, source-volume records, site and permitting requirements, equipment assumptions, LOIs, grant support, pilot documentation and audit-ready environmental records.

Partner with the flagship

Bermuda needs the whole chain.

Harborview is seeking participants across feedstock, transport, sites, equipment, public works, recovered-material markets and project finance.